Sisa saldo per 1 Februari 2026 |
|
|
19.920.000 |
| SENIN | |
| 2026-02-02 |
Wakaf Pembangunan Kanopi dan Teras Musholla
|
3.500.000 |
|
|
| SELASA | |
| 2026-02-03 |
Wakaf Pembangunan Kanopi dan Teras Musholla
|
600.000 |
|
|
| 2026-02-03 |
Semen Padang, Bata Merah, Mata Potong, Mata Arah
|
|
848.000 |
|
| 2026-02-03 |
Besi Plat Dudukan Tiang Kanopi
|
|
600.000 |
|
| 2026-02-03 |
Drat GIV 5/8, Mur 5/8, Rung 5/8
|
|
258.000 |
|
| 2026-02-03 |
Papan Cor 1 Ikat, Batako 100 Pcs, Benang Tukang
|
|
288.000 |
|
| 2026-02-03 |
Semen Andalas 10 Sak, Paku Beton 1 Box
|
|
618.000 |
|
| 2026-02-03 |
Sika, Benang & Paku
|
|
195.000 |
|
| 2026-02-03 |
DP Pemasangan Kanopi
|
|
1.500.000 |
|
| 2026-02-03 |
KNP 3x1.5. (9 Batang) Knp 2 x 1. (11 Batang)
|
|
2.830.000 |
|
| 2026-02-03 |
Kinta Roof Sp 0.42 ( 9750 Cm)
|
|
4.777.500 |
|
| 2026-02-03 |
Baut Spandek 100 Pcs, Roll dan Kawat Las
|
|
110.000 |
|
| 2026-02-03 |
Semen andalas 5 Sak
|
|
250.000 |
|
| 2026-02-03 |
Biaya Pasang Batu Saluran Air
|
|
100.000 |
|
| 2026-02-03 |
Kabel Box PVC saklar
|
|
914.000 |
|
| 2026-02-03 |
Semen Padang 10 Sak & Kinta Roof ( 650 CM)
|
|
930.000 |
|
| 2026-02-03 |
Pasir 2 Kubik dan semen 4 Sak
|
|
570.000 |
|
| 2026-02-03 |
Biaya Pemasangan keramik teras dan keramik Toilet
|
|
1.500.000 |
|
| 2026-02-03 |
Biaya Pemasangan Kanopi dan Keramik
|
|
2.500.000 |
|
| 2026-02-03 |
50 Pcs Batako Hitam
|
|
125.000 |
|
| 2026-02-03 |
Box PVC & Braket TV
|
|
189.000 |
|
| 2026-02-03 |
Semen andalas 4 Sak
|
|
200.000 |
|
| 2026-02-03 |
Pasir 1 Kubik, kuas dan Roll Cat Minyak
|
|
375.000 |
|
| 2026-02-03 |
Semen. 10 Sak Pasir 2 Kubik
|
|
900.000 |
|
| RABU | |
| 2026-02-04 |
Pembelian Kenta Roof 2300 cm
|
|
1.140.000 |
|
| 2026-02-04 |
Pembelian Batu Roaster
|
|
1.022.500 |
|
| KAMIS | |
| 2026-02-05 |
Wakaf Pembangunan Kanopi dan Teras Musholla
|
100.000 |
|
|
| SABTU | |
| 2026-02-07 |
Bisyaroh Ustad Kajian Menyambut Ramadhan
|
|
300.000 |
|
| 2026-02-07 |
Kebutuhan Konsumsi Kajian
|
|
400.000 |
|